Energy

  • Waste Heat Recovery (WHR) Plants

The portion of the heat energy used in industrial plants with processes such as melting, drying, evaporation and cooking is not evaluated and is discharged from the chimney systems is called waste heat. Our company provides support to its customers in the design and feasibility studies of waste heat recovery facilities that enable the conversion of this heat source to electrical energy, monitoring connection and commissioning processes and carrying out operation and maintenance activities.

  • Wind Power Plant and Solar Power Plant
    • Power Production Plants:
    • Project development and feasibility studies,
    • Selection of electromechanical equipment,
    • Preparing corporate reports and conducting corporate relations,
    • Carrying out technical and administrative studies
    • Call letter tracking
    • Contract and specification work,
    • Following the processes of EPDK, TEDAŞ and EİGM,
    • Management of project and implementation phases
    • Assembly and installation works
    • Project process monitoring
    • Test and commissioning works
    • Acceptance procedures
    • Operation and maintenance work
    • Inspection, evaluation and reporting services
  • Energy Transmission
    • Project and Expropriation Processes:

Determination of transmission line routes

      • TEİAŞ processes monitoring
      • 380 kV and 154 kV lines and route studies related to the survey
      • Plan, profile and distribution, preparation of direct distribution list
      • Selection of pole and pole locations and approval of TEIAS
      • Preparation of expropriation plans and approval of TEIAS
      • Field application and direct foot N sections taken and approval to TEIAS
    • Construction Applications
      • Soil surveys
      • Direct excavations
      • Construction of pole foundations
      • Mast mounting
      • Conductor draft forward
      • Commissioning, acceptance of the line and energizing the line
    • Switchgear and Substations:
      • TEİAŞ connection opinion and interconnection system compliance
      • Location of the substation
      • Field surveys and analysis
      • Transformer station applications
      • Transformer substation primary and secondary project design and approval of TEİAŞ
      • Transformer station leveling, excavation and filling operations
      • Substation construction works
      • Substation steel construction works
      • Supply and installation of primary equipment
      • Supply and installation of secondary cabling and control-control and metal clad
      • Primary and secondary tests
      • Commissioning and acceptance procedures
      • Energization of switchyard
  • LV/HV Distribution Works
    • LV/HV Electrical Works Project, Facility, Test and Commissioning Works:
      • Factory and industrial plants
      • Power plants
      • Village networks
      • Transmission lines of village networks
      • Urban infrastructure facilities
      • Mining facilities
      • Industrial plants
      • Irrigation lines
      • Line displacements
      • Institutional building electrical installations
      • GSM facilities
      • Housing and Shopping Center Projects
      • Mobile transformer facilities
      • Transformer and line operation-maintenance works
  • Waste Heat Recovery (WHR) Plants
  • Wind Power Plant and Solar Power Plant
    • Power Production Plants:
  • Energy Transmission
    • Project and Expropriation Processes:
    • Construction Applications
    • Switchgear and Substations
  • LV/HV Distribution Works
    • LV/HV Electrical Works Project, Facility, Test and Commissioning Works:
  • RES (Rüzgar Enerji Santralleri) ve GES (Güneş Enerji Santralleri)
  • Enerji İletimi
    • Proje ve Kamulaştırma Süreçleri:
    • Yapım Uygulamaları:
    • Şalt Sahaları ve Trafo Merkezleri:
  • AG/OG Dağıtım İşleri
    • AG/OG Elektrik İşlerinin Proje, Tesis, Test ve Devreye Alma İşleri

Energy

  • Waste Heat Recovery (WHR) Plants

The portion of the heat energy used in industrial plants with processes such as melting, drying, evaporation and cooking is not evaluated and is discharged from the chimney systems is called waste heat. Our company provides support to its customers in the design and feasibility studies of waste heat recovery facilities that enable the conversion of this heat source to electrical energy, monitoring connection and commissioning processes and carrying out operation and maintenance activities.

  • Wind Power Plant and Solar Power Plant
    • Power Production Plants:
    • Project development and feasibility studies,
    • Selection of electromechanical equipment,
    • Preparing corporate reports and conducting corporate relations,
    • Carrying out technical and administrative studies
    • Call letter tracking
    • Contract and specification work,
    • Following the processes of EPDK, TEDAŞ and EİGM,
    • Management of project and implementation phases
    • Assembly and installation works
    • Project process monitoring
    • Test and commissioning works
    • Acceptance procedures
    • Operation and maintenance work
    • Inspection, evaluation and reporting services
  • Energy Transmission
    • Project and Expropriation Processes:

Determination of transmission line routes

      • TEİAŞ processes monitoring
      • 380 kV and 154 kV lines and route studies related to the survey
      • Plan, profile and distribution, preparation of direct distribution list
      • Selection of pole and pole locations and approval of TEIAS
      • Preparation of expropriation plans and approval of TEIAS
      • Field application and direct foot N sections taken and approval to TEIAS
    • Construction Applications
      • Soil surveys
      • Direct excavations
      • Construction of pole foundations
      • Mast mounting
      • Conductor draft forward
      • Commissioning, acceptance of the line and energizing the line
    • Switchgear and Substations:
      • TEİAŞ connection opinion and interconnection system compliance
      • Location of the substation
      • Field surveys and analysis
      • Transformer station applications
      • Transformer substation primary and secondary project design and approval of TEİAŞ
      • Transformer station leveling, excavation and filling operations
      • Substation construction works
      • Substation steel construction works
      • Supply and installation of primary equipment
      • Supply and installation of secondary cabling and control-control and metal clad
      • Primary and secondary tests
      • Commissioning and acceptance procedures
      • Energization of switchyard
  • LV/HV Distribution Works
    • LV/HV Electrical Works Project, Facility, Test and Commissioning Works:
      • Factory and industrial plants
      • Power plants
      • Village networks
      • Transmission lines of village networks
      • Urban infrastructure facilities
      • Mining facilities
      • Industrial plants
      • Irrigation lines
      • Line displacements
      • Institutional building electrical installations
      • GSM facilities
      • Housing and Shopping Center Projects
      • Mobile transformer facilities
      • Transformer and line operation-maintenance works

BE TEKNOLOJİ INSTAGRAM’DA

CONTACT US FOR MORE INFORMATION

Contact us project, contracting and consultancy activities in the fields of electricity, electronics, automation, mechanical systems, energy markets, construction and defense industry.

OFFICE LINE

+90 532 506 86 60

SUPPORT LINE

+90 532 506 86 60

OUR WORKING HOURS

9:00 – 18:00

OFFICE LINE

+90 532 506 86 60

SUPPORT LINE

+90 532 506 86 60

OUR WORKING HOURS

9:00 – 18:00